Status of J-PARC muon science facility at the year of 2005

Y. Miyake, K. Nishiyama, N. Kawamura, S. Makimura, P. Strasser, K. Shimomura, J. L. Beveridge, R. Kadono, K. Fukuchi, N. Sato, K. Ueno, W. Higemoto, K. Ishida, T. Matsuzaki, I. Watanabe, Y. Matsuda, M. Iwasaki, S. N. Nakamura, J. Doornbos, K. Nagamine

研究成果: Conference article査読

4 被引用数 (Scopus)

抄録

Because of the large changes required in the design of the Materials and Life Science building, the construction schedule was delayed by at least eight months. Therefore, we started construction of the building in the beginning of the fiscal year of 2004, aiming at a first beam on November in the year 2007. After commissioning of the accelerator and beam transport sections in 2008, muon beams will be available for users in 2009. In this letter, the latest construction status of the J-PARC Muon Science Facility is reported.

本文言語English
ページ(範囲)484-487
ページ数4
ジャーナルPhysica B: Condensed Matter
374-375
DOI
出版ステータスPublished - 2006 3 31
イベントProceedings of the Tenth International Conference on Muon Spin Rotation, Relaxation and Resonance -
継続期間: 2005 8 82005 8 12

ASJC Scopus subject areas

  • 電子材料、光学材料、および磁性材料
  • 凝縮系物理学
  • 電子工学および電気工学

フィンガープリント

「Status of J-PARC muon science facility at the year of 2005」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル