Estimating electric power supply restrictions after the Nankai Trough earthquake and evaluating the need for reinforcing the capacity of lines interconnecting power supply areas, we found that capacity reinforcement of the Chubu-Kansai interconnection line used an electricity supply capability in the 60 Hz area of the western part of Japan after the disaster. We also found that this is effective in reducing risk in electric power supply restrictions, based on certain conditions. We also found by estimating construction and maintenance costs that the capacity reinforcement of the Chubu-Kansai interconnection line reduces risk and costs less than an east-west interconnection line.

Original languageEnglish
Pages (from-to)566-576
Number of pages11
JournalJournal of Disaster Research
Volume11
Issue number3
DOIs
Publication statusPublished - 2016 Jan 1

Keywords

  • Electric power supply restriction
  • Estimation of electricity demand
  • Estimation of electricity supply
  • Interconnection line between power supply areas
  • Nankai trough earthquake

ASJC Scopus subject areas

  • Safety, Risk, Reliability and Quality
  • Engineering (miscellaneous)

Fingerprint Dive into the research topics of 'Study on risk reduction of electric power supply restriction by reinforcement of interconnection lines between areas for the Nankai Trough earthquake'. Together they form a unique fingerprint.

  • Cite this