Status of J-PARC muon science facility at the year of 2005

Y. Miyake, K. Nishiyama, N. Kawamura, S. Makimura, P. Strasser, K. Shimomura, J. L. Beveridge, R. Kadono, K. Fukuchi, N. Sato, K. Ueno, W. Higemoto, K. Ishida, T. Matsuzaki, I. Watanabe, Y. Matsuda, M. Iwasaki, S. N. Nakamura, J. Doornbos, K. Nagamine

Research output: Contribution to journalConference articlepeer-review

4 Citations (Scopus)

Abstract

Because of the large changes required in the design of the Materials and Life Science building, the construction schedule was delayed by at least eight months. Therefore, we started construction of the building in the beginning of the fiscal year of 2004, aiming at a first beam on November in the year 2007. After commissioning of the accelerator and beam transport sections in 2008, muon beams will be available for users in 2009. In this letter, the latest construction status of the J-PARC Muon Science Facility is reported.

Original languageEnglish
Pages (from-to)484-487
Number of pages4
JournalPhysica B: Condensed Matter
Volume374-375
DOIs
Publication statusPublished - 2006 Mar 31
EventProceedings of the Tenth International Conference on Muon Spin Rotation, Relaxation and Resonance -
Duration: 2005 Aug 82005 Aug 12

Keywords

  • J-PARC
  • Muon

ASJC Scopus subject areas

  • Electronic, Optical and Magnetic Materials
  • Condensed Matter Physics
  • Electrical and Electronic Engineering

Fingerprint Dive into the research topics of 'Status of J-PARC muon science facility at the year of 2005'. Together they form a unique fingerprint.

Cite this